A customer’s control room project needs to show images from three surveillance computers on one 7680×2400mm P1.538 LED screen. Operators will sit about 3m from the screen. This control room video wall must run 24 hours a day, and the LED modules, power supplies, and receiving cards must remain replaceable from the front after the screen is installed against the wall.

To configure the control room video wall, we first confirm the output ports on the three computers and the number of images that must be shown at the same time. We then calculate the cabinet layout and screen resolution from the wall dimensions. After these details are confirmed, we select the H2 input and output cards, the number of network cables, the power distribution, and the backup configuration. A quotation for control room video walls must include this equipment as well as the screen area.

This control room LED video wall solution is designed for one control room where three computers are connected to the display. Other video wall control room projects or a command center video wall may also include decoders, conferencing systems, or signals from other locations. In those cases, the controller and cabling must be recalculated instead of copying this three computer signal configuration.

What the Control Room LED Video Wall Must Support

The customer has confirmed the wall dimensions, three surveillance computers, a 3m viewing distance, and 24 hour continuous operation. When quoting video walls for control rooms, these details directly determine the screen size, H2 unit, network cables, and backup configuration.

This LED video wall for control rooms must meet the following requirements:

  1. The customer accepts a 7680×2400mm screen built with 640×480mm cabinets.
  2. Three surveillance computers connect through HDMI at the same time.
  3. All three surveillance computers use HDMI output. Three of the four H2 inputs connect to the computers.
  4. During normal operation, the three images are displayed side by side.
  5. When an event needs closer attention, one image is enlarged while the other two remain visible.
  6. The screen runs continuously for 24 hours each day.
  7. The H2 uses dual power supplies and dual network cable backup.
  8. The screen is installed against the wall, and the LED modules, power supplies, and receiving cards are replaced from the front.
  9. The customer is responsible for the steel structure, on site power distribution, and installation. TOPVIEW provides the connection drawing, configuration files, and remote commissioning.

A video wall for control room use with only one computer can use fewer input ports. This control room LED video wall has three HDMI signals, so video wall control rooms using this configuration require at least three available H2 input ports.

Pixel Pitch and Packaging Options for the Control Room LED Video Wall

The customer originally requested a 7500×2500mm screen and specified 640×480mm cabinets. However, 7500×2500mm cannot be assembled completely from 640×480mm cabinets. The final control center video wall therefore uses 12 columns and 5 rows of cabinets, giving a screen size of 7680×2400mm. The customer has accepted this size.

When selecting a DVLED video wall for control room use, the viewing distance is not the only factor. The size of text, surveillance windows, maps, and icons must also be considered. The table below compares the available configurations for a 7680×2400mm screen.

ConfigurationFull-screen resolution at 7680×2400mmSuitable customer requirementsBudget levelRecommendation for this control room
P1.86 GOB4128×1290Mainly displays large surveillance images. The viewing distance is longer, and small-text clarity is not a priority.Lower budgetChoose when the customer's budget is limited
P1.538 GOB4992×1560Operators sit about 3m from the screen and need to view surveillance images, text, and warning information from three computers at the same time.Medium budgetSelected for this control room
P1.25 GOB6144×1920Operators sit closer to the screen, and the surveillance software contains large amounts of small text, dense tables, maps, and smaller warning icons.Higher budgetChoose when smaller text and icons must be displayed
COBP1.538 COB: 4992×1560; P1.25 COB: 6144×1920The customer requires less screen reflection, more uniform black images, clearer small text and surveillance images at close range, and stronger surface protection.For the same model, COB costs about 15% more than standard GOB.Choose COB when the project requires a smaller pixel pitch, better surface protection, and the budget allows. See the.COB, SMD and GOB comparison guide

This control room LED video wall uses the current configuration marked in the table. It is a fine pitch LED video wall control room project with the following additional specifications:

  1. Cabinet size: 640×480mm
  2. Number of cabinets: 60
  3. Cabinet layout: 12 columns × 5 rows
  4. Screen size: 7680×2400mm
  5. Screen area: 18.432㎡
  6. Brightness: at least 700cd/㎡
  7. Refresh rate: at least 3840Hz
  8. Standard viewing angle: 140° horizontal and vertical
  9. Maintenance method: front maintenance

This is a control room fixed led video wall, not a rental screen that will be assembled and dismantled repeatedly. The cabinets, steel structure, and cables must be designed for permanent installation.

How the Control Room LED Video Wall Displays Three Computers at the Same Time

The control room video wall setup must be based on the ports and actual images from the three computers. In the control room video wall design, each surveillance computer connects to one of the H2 input ports with an HDMI cable. The H2 displays the three images across the full 4992×1560 screen.

The customer specified two operating layouts for this control room LED video wall:

  1. During normal surveillance, the images from the three computers are displayed side by side at equal widths, allowing the operator to view all three systems at the same time.
  2. When an event on one computer needs closer attention, that image can be enlarged. The other two images use smaller display areas but remain visible on the screen. After the event has been handled, the three images can be returned to an equal side-by-side layout.

The image positions and sizes can be configured in advance. After the equipment arrives on site, we can also provide remote commissioning based on the customer’s surveillance images.

The three computers normally output 16:9 images, but this control room LED screen has a resolution of 4992×1560 and is not standard 16:9. The led video walls in control room and monitoring setups must display 3 windows within this actual screen area.

If three 16:9 images are stretched to fill the whole screen, each image will be distorted. During on site setup, the original aspect ratio should be maintained. Any unused area can remain blank or show fixed information. This is a specific issue that video wall control room technology must address. The window sizes can be adjusted to produce a balanced layout without distorting the video.

What the NovaStar H2 Does in the Control Room LED Video Wall

This control room video wall system uses one NovaStar H2 for local signal input, image processing, and LED screen loading.

The H2 configuration in this control room video wall solution includes:

  1. Two dual port HDMI 2.0 input cards provide four input ports in total, three of which connect to the customer’s surveillance computers.
  2. One sending card with 16 Ethernet ports and two fiber optic ports connects to the LED screen.
  3. One four port HDMI output card can connect to other display devices.
  4. The H2 has dual power supplies for backup power within the controller.

If a command center LED display must connect to more computers, decoders, conferencing systems, or other equipment, the number of input ports, the number of windows displayed at the same time, and the total output resolution must be checked again.

In this control room LED video wall, the H2 works as both the control room video wall controller and the control room video wall processor. It receives the HDMI signals from three computers, places the three windows in their assigned positions, and then sends the complete image to the LED screen through the sending card.

A video matrix switches signals between multiple inputs and multiple display devices. This control room system has only three computers and one LED screen. Because the H2 already provides three inputs and window processing, a separate control room video wall matrix is not required. If the customer already has a matrix on site, its model, ports, and output resolution must be provided before the processor model can be confirmed.

The control room video wall software used for this system sets up the LED screen, adjusts the windows, and saves the screen configuration. It does not create the surveillance dashboard or determine warning information. For controller connection and screen configuration, see the LED display setup guide.

Dashboards, maps, camera images, and warning pop-ups are generated by the customer’s computers and surveillance software. The LED screen only displays the computer output clearly and reliably.

If the customer needs control room software with video wall management and AV-over-IP, a separate system must be configured according to the number of computers, transmission distance, network, and user permissions. The H2 alone does not provide these functions.

Additional Equipment for Managing Multiple Control Rooms from One Platform

The NovaStar H2 mainly handles local video processing and LED screen loading within one control room. It is not a centralized management platform for multiple sites.

If one office needs to manage control room LED screens at different locations, each location requires network-enabled control equipment, and the office requires a centralized management platform. When access through the public Internet is required, a VPN or dedicated line should be selected according to the customer’s network conditions.

A multi site system normally needs the following additional functions:

  1. Check whether the controller and LED screen at each location are online.
  2. Check the power-distribution switches and signal status. Temperature can be displayed only after temperature sensors are installed in the project.
  3. Select the input signal to be displayed remotely.
  4. Turn the screen on and off remotely through intelligent power distribution.
  5. Set different permissions for different operators.
  6. Save operation logs and audit records.
  7. Keep the local control room operating normally if the network connection is lost.

Remote screen control cannot be achieved by turning off only the H2. The power circuits must be controlled through an intelligent power-distribution cabinet, remote I/O, or a central control system. The centralized management platform must also handle multi user permissions and operation logs.

These multi-site management functions are not included in the standard H2 configuration for this project. After the customer specifies the multi-site management requirements, we will list the equipment and cost separately according to the number of sites, network conditions, required remote operations, and permission settings.

Backup Included in the Control Room LED Video Wall

For 24-hour continuous operation, this control room LED video wall includes dual H2 power supplies, dual network-cable backup, and replacement parts that can be kept on site. The equipment list includes:

  1. Dual H2 power supplies.
  2. Dual network-cable backup for the LED screen.
  3. Spare LED modules.
  4. Spare power supplies.
  5. Spare receiving cards.

The dual H2 power supplies reduce the risk of the controller stopping because one power supply fails. The dual network cable backup allows the system to switch to the backup line if the primary signal line has a problem.

The spare LED modules, power supplies, and receiving cards are used for on site repairs. If a part inside the screen fails, staff must locate the fault and replace the affected part.

Maintenance, Power Consumption, and Installation Responsibilities for the Control Room LED Video Wall

This control room LED video wall uses a front-maintenance design. The LED modules, power supplies, and receiving cards can all be removed from the front, so staff do not need to enter the space behind the screen.

The LED modules, power supplies, and receiving cards can be replaced from the front, but the steel structure must still provide space for network cables, power cables, grounding cables, and heat dissipation.

This control room LED screen has an area of 18.432㎡. At an average power consumption of 550W/㎡, the screen’s average power consumption is about 10.14kW. At a maximum power consumption of 650W/㎡, the screen’s maximum power consumption is about 11.98kW. After adding about 210W for the H2, the system’s average power consumption is about 10.35kW and its maximum power consumption is about 12.19kW.

The power-distribution box, main switch, branch switches, cables, and grounding protection must be designed for the maximum power consumption and the local electrical standards. The customer’s local electrician should confirm the final design according to the site voltage, cable distance, and power-distribution conditions.

The steel structure also cannot be quoted from the screen area alone. The wall condition, screen weight, installation method, front-maintenance space, and trim dimensions must be confirmed.

The quotation for this control room LED video wall covers equipment supply. The customer is responsible for the on site steel structure and installation. TOPVIEW provides the cabinet layout drawing, system connection drawing, configuration files, and power-distribution requirements.

If the customer requires overseas on-site installation and commissioning, we can arrange personnel to travel to the project site. The engineer’s travel, accommodation, and on site service costs must be calculated separately.

TOPVIEW Production and Delivery Responsibilities

Whether the procurement documents use the term control room video wall manufacturer or video wall control room manufacturer, the buyer should confirm whether the supplier is responsible for LED module production, cabinet assembly, full screen aging, and system commissioning. This prevents a quotation from listing only the complete screen without defining the test scope.

TOPVIEW is a control room video wall factory responsible for LED module production, cabinet assembly, full-screen testing, system configuration, packaging, and shipment.

As an LED display supplier for command center projects, we can configure the screen, controller, power distribution, and spare parts according to the wall dimensions, viewing distance, number of signals, and backup requirements provided by the customer.

Before shipment, export LED displays normally undergo continuous aging for 7 to 15 days. Video is played during the aging period to check whether the LED modules, cabinets, power supplies, receiving cards, and signal connections remain stable.

After the aging test, the following items must also be checked:

  1. Check the complete screen for unlit LED modules, abnormal colors, or signal interruptions.
  2. Check whether the brightness and color are consistent between cabinets.
  3. Confirm that signals from all three computers can be connected at the same time.
  4. At the actual operating brightness for the control room, check whether small text, maps, grayscale, and warning colors are clear.
  5. Confirm that the dual H2 power supplies operate normally.
  6. Disconnect the primary network cable and confirm that the backup network cable continues to carry all three images.
  7. Confirm that the configuration files match the screen being shipped.

The equipment list for this control room LED video wall includes the screen, H2, receiving cards, power supplies, power distribution box, internal cables, network cables, and agreed spare parts.

The customer is responsible for the surveillance computers, cameras, video recorder, surveillance software, steel structure, on site power distribution, installation, international shipping, and customs clearance at the destination. Final responsibilities are subject to the final quotation and contract.

Commissioning and After-Sales Support for the Control Room LED Video Wall

After the customer receives the equipment, we can provide remote commissioning based on the on-site connections. We help the customer load the screen configuration, confirm the signals from the three computers, and restore the preset image layout.

TOPVIEW provides a 5 year warranty for this control room LED video wall and also supplies:

  1. Screen configuration files.
  2. System connection drawings.
  3. Remote commissioning.
  4. Operating training.
  5. Troubleshooting guidance.
  6. Spare-parts replacement guidance.

Control Rooms That Can Refer to This LED Video Wall Configuration

The P1.538 screen, local H2 control, and front-maintenance structure used in this control room LED video wall can serve as a configuration reference for the control rooms below. However, each control room still needs its own equipment list based on the actual number of signals, software, and operating permissions. The equipment list for this three-computer signal project cannot be copied directly.

  1. A NOC video wall normally displays network status, server status, link warnings, and images from maintenance computers.
  2. An operations center video wall normally displays business data, live video, maps, and work progress at the same time.
  3. A SOC video wall displays security warnings, network status, and incident-handling images.
  4. A CCTV control room video wall mainly displays camera feeds, recorded video playback, maps, and warning information.
  5. Emergency control room video wall systems must also allow for consultation, video conferencing, signals from multiple departments, and backup equipment.
  6. If a security operations center video wall must be used to control computers in the equipment room from an operator console, remote control must be added. Different users also need separate operating permissions, and their operations must be recorded.
  7. A video wall CCTV control room project must first confirm the number of cameras, the decoding method, the number of windows displayed at the same time, and the output ports on the recording platform.
  8. A video wall NOC project must consider more than the screen resolution. The dashboard font size, warning colors, and operator viewing distance must also be confirmed.
  9. A video wall broadcast control room places more importance on signal switching, live-program monitoring, clock display, and low latency.
  10. An LED video wall for monitoring room use must balance brightness, text clarity, viewing comfort during long shifts, and convenient maintenance.
  11. A hospital command center video wall must also consider low brightness operation, noise, dust protection, and image input from the hospital information system.
  12. An emergency operations center video wall normally requires additional conferencing, command, backup, and system integration functions.
  13. If a network operations center video wall must be centrally managed across multiple locations, a separate management platform and network system are required.
  14. A police command center video wall may also require network isolation, permission levels, operation auditing, and a higher level of system backup.

Information Required Before Requesting a Quote for a Control Room LED Video Wall

When preparing a control room video wall RFP, please provide the following information:

  1. Available wall dimensions for installation.
  2. The shortest and longest viewing distances from the operator console to the screen.
  3. The number of computers and signal sources to be connected.
  4. The output ports and resolution of each device.
  5. The number of windows to be displayed at the same time.
  6. The image layouts the customer needs to save.
  7. Daily operating hours and the normal operating brightness in the control room.
  8. The equipment and signal lines that require backup.
  9. The local voltage and on-site power-distribution conditions.
  10. Whether intelligent power distribution, centralized management, or AV-over-IP is required.
  11. The division of responsibility for the steel structure, installation, shipping, and commissioning.

The security and command center LED display price is affected by the screen area, pixel pitch, LED brand, GOB protection, controller configuration, backup level, power distribution, structure, shipping, installation, and warranty period.For the general screen cost items included in the quotation, see the indoor LED display price guide.

After receiving the project information, we will check the screen size, pixel pitch, resolution, controller loading capacity, image layout, power consumption, backup configuration, and equipment list before providing the corresponding control room LED video wall solution.